Pages

Friday 27 September 2013

Photos for September

 Boiler house re-rendered and top of wall re-built.

 Hearth plastered, awaiting false oak lintel and cover place.

 Conduit tracks in the loft to go over the insulation.

 Loft conversion!  Platform over new joists to take header tanks.
I was a bit toasty doing this!  Bit like working in a sauna for people under 4ft tall while wearing a woolly jumper 10cm thick!

 Trying to hide placcy surface mounting stuff for the lights...
Should be areet when painted.

Removing old steel central heating pipes, copper water pipes and electrical cables to boiler house from spare room, all cemented in together!

No comments:

Post a Comment